Projects & Clients

  • Opticomm Pty Ltd

    We are the primary contractor to Opticomm Victoria, building and testing fibre networks over 117 new estates acrossVictoria. In addition to the new estate works we have also been constructing (pit and pipe), cable placement and splicing backhaul links and fibre relocations. Interlink are on call 7 days a week in case of any fibre breaks or equipment failures.

  • Mobile Phone Tower access tracks (CMTS)

    Maintenance of CMTS access tracks involving the undertaking of clearing, track formation, grading, base compaction in conjunction with drainage construction (open or pipe) and installation of crushed rock surfacing. Hardstand construction or rectification.

    • Mt Prospect (Newlyn North) 1,100m

    • Werribee South 1,465m

    • Myrtleford 400m steep terrain

  • Telstra

    Wideband Projects
    Civils, placement, splicing and testing fibre circuits on the Telstra Network including out of hours cable cutovers.
    IEN
    Placement and splicing of 312F cable from Hawthorn Exchange to the Clayton Data Centre. Several other IEN Projects including Hawthorn to Caulfield and Narre Warren to Dandenong South.

  • Data Centres - Microsoft

    Splicing/termination of 40 x 864F spider ribbon fibre optic cables and associated testing.

  • AARNet

    Customer connections and infrastructure builds throughout Victoria (metro and rural)

  • Teletok

    GPON infrastructure tender consultation, design and procurement.

  • Multiple NBN MDU Projects

    NBN MDU fibre builds. Splicing in the basement PDH and testing to every apartment.

  • Swinburne University

    Hawthorn and Croydon Campuses Installation of new fibre racks. Involved cable installation, splicing and testing of every fibre.

  • NBN Transit Network

    Splicing of 288F and 576F cables, and installation of panels at Telstra exchanges. Projects include Lilydale to Mooroolbark, Lilydale to Warrenwood, and Cheltenham to Mordialloc.

  • Optus

    Civils, cable hauling and fibre splicing/termination, inclusive of infrastructure relocations.

  • TPG

    Cable Overblow and Termination Installation of 30km 144F cable in existing TPG Sub-duct using overblowing method. Termination of installed cables into live network.

Our clients