Projects & Clients
-
Opticomm Pty Ltd
We are the primary contractor to Opticomm Victoria, building and testing fibre networks over 117 new estates acrossVictoria. In addition to the new estate works we have also been constructing (pit and pipe), cable placement and splicing backhaul links and fibre relocations. Interlink are on call 7 days a week in case of any fibre breaks or equipment failures.
-
Mobile Phone Tower access tracks (CMTS)
Maintenance of CMTS access tracks involving the undertaking of clearing, track formation, grading, base compaction in conjunction with drainage construction (open or pipe) and installation of crushed rock surfacing. Hardstand construction or rectification.
Mt Prospect (Newlyn North) 1,100m
Werribee South 1,465m
Myrtleford 400m steep terrain
-
Telstra
Wideband Projects
Civils, placement, splicing and testing fibre circuits on the Telstra Network including out of hours cable cutovers.
IEN
Placement and splicing of 312F cable from Hawthorn Exchange to the Clayton Data Centre. Several other IEN Projects including Hawthorn to Caulfield and Narre Warren to Dandenong South. -
Data Centres - Microsoft
Splicing/termination of 40 x 864F spider ribbon fibre optic cables and associated testing.
-
AARNet
Customer connections and infrastructure builds throughout Victoria (metro and rural)
-
Teletok
GPON infrastructure tender consultation, design and procurement.
-
Multiple NBN MDU Projects
NBN MDU fibre builds. Splicing in the basement PDH and testing to every apartment.
-
Swinburne University
Hawthorn and Croydon Campuses Installation of new fibre racks. Involved cable installation, splicing and testing of every fibre.
-
NBN Transit Network
Splicing of 288F and 576F cables, and installation of panels at Telstra exchanges. Projects include Lilydale to Mooroolbark, Lilydale to Warrenwood, and Cheltenham to Mordialloc.
-
Optus
Civils, cable hauling and fibre splicing/termination, inclusive of infrastructure relocations.
-
TPG
Cable Overblow and Termination Installation of 30km 144F cable in existing TPG Sub-duct using overblowing method. Termination of installed cables into live network.